This USDA-funded project involved the replacement of the water main and water services through the Town of Sparta along US 21 from Grandview Drive to Trojan Avenue with milling and replacement of the existing asphalt surface course over the waterline. The project also included the complete removal of all existing pavement and sidewalks from Doughton Street to Cheek Street, as well as the intersection of US 21 and NC 18. Following the removal of the old asphalt, the profile of the roadway was adjusted to allow for a better tie-in of new curb and gutter, concrete sidewalks, brick paver sidewalks, and removal and replacement of the existing traffic signal with a new architectural mast arm traffic and crosswalk signal system.
Sparta, NC
Town of Sparta
July 2021