This 90,720 sf distribution center, located on 10.05 acres, uses the tilt-up construction method. This building includes 28-dock positions, a 3,722 sf office area, and a wood-grained finish etched in the concrete tilt wall panels.
Mills River, NC
Collett & Associates
MCA Architecture - Greenville
October 2021