Phase 2 of the Gateway 85 project consists of a 1,527,231 sf logistics warehouse located on a 105-acre site. The shell of the building will be a conventional steel-frame with full-height wall bearing tilt-up concrete panels with 122 dock doors and 40’-49’ clear height. The scope also includes an office build-out consisting of 13,508 sf, as well as parking for 158 car spaces and 360 trailer spaces.
Lowell, NC
NorthPoint Development
StudioNorth Architecture
November 2022