Multi-phased renovation of twelve floors of Class A Office space within existing high rise building. Scope of work included selective demolition of existing offices, flooring, ceilings, and MEP systems allowing for an open floor plan introducing natural light in to the space. Floor to ceiling glass was installed on the front wall of each office and conference room. New flooring and paint throughout. The existing lighting system was updated with an energy saving Lutron Occupancy system. Vannoy Construction worked closely with the client, furniture vendor, IT vendor, and AV vendor on the front end of the project to develop a detailed phased construction schedule to ensure all parties involved could meet the aggressive schedule.
Winston-Salem, NC
Walter, Robbs, Callahan & Pierce
March 2017